Construction of Beykoz Riva Bridge and Approach Roads

Client: Istanbul Metropolitan Municipality
Scope of Works:
- Construction of a 155 m Long Prestressed Precast Girder Bridge
- Construction of Bridge Ramp/Interchange Arms (~800 m)
- Construction of 65 m Deep Ø165 cm Bored Piles (Cast-in-Place Concrete Piles)
- Construction of Stone Columns
- Electrical, Lighting, Telecommunications, and Potable Water Infrastructure Works
- Retaining Structures
- Dismantling and Demolition of Existing Riva Bridge (120 m Stream Bridge)
Construction Period: December 2015 – December 2016




