Construction of Sincan West Railway Connection and Superstructure & Electrification Works of Sayding

 

Client: Turkish State Railways (TCDD) General Directorate, Ankara

Scope of Works:

  • 13,160 m Track Laying (Including Superstructure Design)
  • 10 Turnouts (Railway Switches)
  • Construction of 10,000 meters of Cable Ducts
  • 29,200 cubic meters of Ballast Laying
  • Construction of 2,250 m² Gabion Wall
  • Supply and Installation of 280 Concrete Catenary Poles
  • Supply and Installation of 30 Steel Catenary Poles
  • Construction of 1 Technical Building
  • Electrification Design, Material Supply, and Installation for 13,160 m of Track

Construction Period: May 2022 – December 2023