Construction of Sincan West Railway Connection and Superstructure & Electrification Works of Sayding

Client: Turkish State Railways (TCDD) General Directorate, Ankara
Scope of Works:
- 13,160 m Track Laying (Including Superstructure Design)
- 10 Turnouts (Railway Switches)
- Construction of 10,000 meters of Cable Ducts
- 29,200 cubic meters of Ballast Laying
- Construction of 2,250 m² Gabion Wall
- Supply and Installation of 280 Concrete Catenary Poles
- Supply and Installation of 30 Steel Catenary Poles
- Construction of 1 Technical Building
- Electrification Design, Material Supply, and Installation for 13,160 m of Track
Construction Period: May 2022 – December 2023