Track Renewal Works Between Bilecik and Karaköy (Yayla) Stations

 

Client: Turkish State Railways (TCDD) 1st Regional Directorate, Istanbul

Scope of Works:

Turkish State Railways (TCDD) 1st Regional Directorate, Istanbul – 6.5 km of Existing Railway Line:  

  • Dismantling of Track Laying Machine Belonging to the Authority
  • Loading onto Wagons, Unloading, and Distribution within Depot Area
  • Preparation of Infrastructure
  • Preparation of Panel Production Area for Manufacturing 36 m Frames with UIC 60 Rails and B70 Sleepers
  • Unloading of 36 m UIC 60 Rails and B70 Sleepers from Wagons
  • Loading of Prepared Panels onto Wagons and Laying with Track Laying Machine
  • Loading of First Layer Ballast onto FB Wagons and Unloading onto Track
  • Dismantling of 4 Existing Turnouts
  • Installation of 4 R300 Turnouts
  • Installation of 1 R500 Turnout (From Conventional Line to High-Speed Rail Line)

Construction Period: September 2013 – December 2013