Yıldırım Beyazıt University Çubuk Campus Area – Azman Stream, Section 1 Flood Protection and Bridge Construction

Client: State Hydraulic Works (DSİ) 5th Regional Directorate, Ankara
Scope of Works:
- 1,062 m Trapezoidal Concrete Rehabilitation Channel
- Sedimentation Basin with Dimensions 24×40×3 m
- Construction of 1 Pedestrian Bridge
Construction Period: July 2022 – May 2024








