Categories:

Yıldırım Beyazıt University Çubuk Campus Area – Azman Stream, Section 1 Flood Protection and Bridge Construction

 

Client: State Hydraulic Works (DSİ) 5th Regional Directorate, Ankara

Scope of Works:

  • 1,062 m Trapezoidal Concrete Rehabilitation Channel
  • Sedimentation Basin with Dimensions 24×40×3 m
  • Construction of 1 Pedestrian Bridge

Construction Period: July 2022 – May 2024

Related projects