Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
KM 167+235 · KM 159+680
On the Arifiye–Pamukova section of the conventional Istanbul–Ankara railway, the line was crossed from above at Km 159+680 with a 30 m prestressed precast beam overpass, and from below at Km 167+235 with an underpass. Along the approach roads, the ground was improved with 12,065 m of stone columns and 8,699 m of deep soil mixing columns, and stability was secured with 1,020 m of bored piles. Covering 1,300 m of connection roads, 12,000 m² of reinforced earth walls and 120,000 m³ of earthworks, the work was completed on behalf of the TCDD Istanbul Regional Directorate.
Scope of work
- 0130 m prestressed precast beam bridge over the railway
- 021,300 m of connection roads
- 0312,065 m of Ø50 cm stone columns
- 048,699 m of Ø100 cm deep soil mixing columns
- 0512,000 m² of reinforced earth walls
- 06320 m underpass and ramp roads
- 071,020 m of Ø100 cm bored piles
- 08900 m² of reinforced concrete retaining walls
- 09425 m² of precast facade panels
- 10120,000 m³ of earthworks
- 11150 m of Ø300 mm stormwater drainage
- 1224 m of Ø500 mm steel pipe jacking
Site photos
Similar projects
4 photosBridge · Road
Eskihisar Ferry Road – Cengiz Topel Street Junction and Overpass Bridge, Darıca
Kocaeli Metropolitan Municipality2025–2026
KM 370+5173 photosBridge · Railway
Highway Overpass at Km 370+517, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2020–2021
KM 368+4488 photosBridge · Railway
Highway Overpass at Km 368+448, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2019–2020
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.