Azman Stream Flood Protection and Bridge Works (Lot 1), Yıldırım Beyazıt University Çubuk Campus
The works under the Lot 1 contract for Azman Stream, which runs through Ankara Yıldırım Beyazıt University's Çubuk Campus, were carried out on behalf of the DSİ 5th Regional Directorate. The project comprised a 1,062 m trapezoidal concrete channel, a 24.00×40.00×3.00 m sedimentation pool and a pedestrian bridge.
Scope of work
- 011,062 m trapezoidal concrete channel
- 0224×40×3 m sedimentation pool
- 031 pedestrian bridge
Site photos
Similar projects
5 photosHydraulic Structures · Bridge
Azman Stream Flood Protection and 3 Bridge Works (Lot 2), Yıldırım Beyazıt University Çubuk Campus
DSİ (State Hydraulic Works)2024–2025
2 photosBridge · Hydraulic Structures
Renewal of 14 Stream-Crossing Bridges and Culverts, Çatalca–Silivri
Istanbul Metropolitan Municipality2017–2018
4 photosBridge · Road
Eskihisar Ferry Road – Cengiz Topel Street Junction and Overpass Bridge, Darıca
Kocaeli Metropolitan Municipality2025–2026