Azman Stream Flood Protection and 3 Bridge Works (Lot 2), Yıldırım Beyazıt University Çubuk Campus
The Lot 2 contract for the section of Azman Stream running through Yıldırım Beyazıt University's Çubuk Campus was carried out with the DSİ General Directorate's Flood Control Department. A 2,000 m trapezoidal concrete channel, 110 m of reinforced concrete U-channel with transition structures, and three road bridges were built. An irrigation pond and a reinforced concrete outlet structure were also within the scope. The project was completed between January 2024 and August 2025.
Scope of work
- 012,000 m trapezoidal concrete channel
- 023 road bridges
- 03110 m U-shaped concrete channel and transition structures
- 04Irrigation pond and outlet structure
Site photos
Similar projects
4 photosHydraulic Structures · Bridge
Azman Stream Flood Protection and Bridge Works (Lot 1), Yıldırım Beyazıt University Çubuk Campus
DSİ (State Hydraulic Works)2022–2023
2 photosBridge · Hydraulic Structures
Renewal of 14 Stream-Crossing Bridges and Culverts, Çatalca–Silivri
Istanbul Metropolitan Municipality2017–2018
4 photosBridge · Road
Eskihisar Ferry Road – Cengiz Topel Street Junction and Overpass Bridge, Darıca
Kocaeli Metropolitan Municipality2025–2026
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.