
Highway Overpass at Km 370+517, Irmak–Zonguldak Railway
KM 370+517
At Km 370+517 of the Irmak–Zonguldak line, in the Çaycuma section, a 70 m prestressed precast beam bridge was built, crossing both the railway and the parallel highway in a single span. A total of 1,408 m of Ø120 cm bored piles was installed for the foundations, and the approach roads were completed with reinforced earth walls. The client was the TCDD 2nd Regional Directorate.
Scope of work
- 0170 m prestressed precast beam bridge over the railway and parallel highway
- 02Bridge connection roads
- 031,408 m of Ø120 cm bored piles
- 04Reinforced earth walls
Site photos
Similar projects
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
KM 368+4488 photosBridge · Railway
Highway Overpass at Km 368+448, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2019–2020
KM 93+2557 photosBridge · Railway
Highway Overpass at Km 93+255, Ankara–Kayseri Railway
TCDD (Turkish State Railways)2017–2018
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.