
High-Security Perimeter Systems at Osmaneli, Mekece and Pamukova Stations
For the TCDD Istanbul Regional Directorate, high-security panel fencing and retaining walls were built at Osmaneli, Mekece and Pamukova stations. Protecting the station areas against unauthorised access, the work was completed between October 2021 and May 2022.
Scope of work
- 01High-security fences and retaining walls at three stations
Site photos
Similar projects
3 photosRailway · Electrification
Track Superstructure and Electrification of the Sincan West Rail Link and Siding
TCDD (Turkish State Railways)2022–2023
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
KM 370+5173 photosBridge · Railway
Highway Overpass at Km 370+517, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2020–2021
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.