Track Superstructure and Electrification of the Sincan West Rail Link and Siding

For the TCDD General Directorate's Track Maintenance Department, the track superstructure and all electrification works of the Sincan West railway connection and depot area (siding) were delivered, including all design services. 13,160 m of track, 10 turnouts, 29,200 m³ of ballast and 10,000 m of cable ducts were built. Electrification, catenary and system integration for the same length of line were completed from design through procurement and installation. A technical building was also constructed as part of the project.

Scope of work

  • 0113,160 m of track laying (including superstructure design)
  • 0210 turnouts
  • 0310,000 m of cable ducts
  • 0429,200 m³ of ballast
  • 052,250 m² of fencing
  • 06Supply and installation of 280 concrete catenary poles
  • 07Supply and installation of 30 steel catenary poles
  • 081 technical building
  • 09Electrification of 13,160 m of line: design, procurement and installation

Site photos

Track Superstructure and Electrification of the Sincan West Rail Link and Siding – Photo 1

1 / 3

Planning a similar project?

Give us 15 minutes with your project team and we will walk you through our capacity and references.

Request a quote