
Highway Overpass at Km 93+255, Ankara–Kayseri Railway
KM 93+255
At Km 93+255 of the Ankara–Kayseri railway, past Kırıkkale station, a level crossing was closed and replaced by a highway overpass spanning the line. Built together with all its approach roads on behalf of the TCDD Ankara Regional Directorate, the work was completed between September 2017 and October 2018.
Scope of work
- 01Replacement of a level crossing with a highway overpass over the railway
Site photos
Similar projects
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
KM 370+5173 photosBridge · Railway
Highway Overpass at Km 370+517, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2020–2021
KM 368+4488 photosBridge · Railway
Highway Overpass at Km 368+448, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2019–2020
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.