Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova

KM 167+235 · KM 159+680

On the Arifiye–Pamukova section of the conventional Istanbul–Ankara railway, the line was crossed from above at Km 159+680 with a 30 m prestressed precast beam overpass, and from below at Km 167+235 with an underpass. Along the approach roads, the ground was improved with 12,065 m of stone columns and 8,699 m of deep soil mixing columns, and stability was secured with 1,020 m of bored piles. Covering 1,300 m of connection roads, 12,000 m² of reinforced earth walls and 120,000 m³ of earthworks, the work was completed on behalf of the TCDD Istanbul Regional Directorate.

Scope of work

  • 0130 m prestressed precast beam bridge over the railway
  • 021,300 m of connection roads
  • 0312,065 m of Ø50 cm stone columns
  • 048,699 m of Ø100 cm deep soil mixing columns
  • 0512,000 m² of reinforced earth walls
  • 06320 m underpass and ramp roads
  • 071,020 m of Ø100 cm bored piles
  • 08900 m² of reinforced concrete retaining walls
  • 09425 m² of precast facade panels
  • 10120,000 m³ of earthworks
  • 11150 m of Ø300 mm stormwater drainage
  • 1224 m of Ø500 mm steel pipe jacking

Site photos

Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova – Photo 1

1 / 4

Planning a similar project?

Give us 15 minutes with your project team and we will walk you through our capacity and references.

Request a quote