Construction Works of the Overpass Bridge at the Intersection of Eskihisar Ferry Road and Cengiz Topel Avenue, Darıca District

Client / Contracting Authority: Kocaeli Metropolitan Municipality
Scope of Works:
- Construction of a 35-meter span bridge with prestressed precast girders
- Main arterial road widening
- Stone masonry wall construction
- Mechanically stabilized earth (MSE) wall construction
- Stormwater drainage and other infrastructure works
- Electrical utility relocation works and lighting poles
Construction Period: September 2025 – Ongoing




