Categories:

Yıldırım Beyazıt University Çubuk Campus Area – Azman Stream, Section 2

 

Client: General Directorate of State Hydraulic Works (DSİ), Flood Control Department, Ankara

Scope of Works:

  • 2,000 m Trapezoidal Concrete Rehabilitation Channel
  • Three Vehicular Bridges
  • 110 m U-Shaped Channel Construction
  • Construction of Irrigation Pond and Outlet Structure

Construction Period: January 2024 – August 2025

Related projects