Yıldırım Beyazıt University Çubuk Campus Area – Azman Stream, Section 2

Client: General Directorate of State Hydraulic Works (DSİ), Flood Control Department, Ankara
Scope of Works:
- 2,000 m Trapezoidal Concrete Rehabilitation Channel
- Three Vehicular Bridges
- 110 m U-Shaped Channel Construction
- Construction of Irrigation Pond and Outlet Structure
Construction Period: January 2024 – August 2025