Multi-Plate Corrugated Steel Rock-Fall Tunnel at Km 311+550–311+700, Irmak–Zonguldak Railway
In the area of the Irmak–Zonguldak railway known as the tunnels section, between Km 311+550 and 311+700, a 150 m long, 5.85 m high epoxy-coated multi-plate corrugated steel tunnel was built to protect the line against rock fall. Carried out without interrupting rail traffic, it was a pioneering project in Türkiye. Alongside the tunnel, an 80 m long, 8 m high stone wall and ballast retaining wall were built. Site access was only possible by placing eight rows of 2×2 m precast culverts in the constantly flowing stream and rebuilding the crossing after every flood. The work for the TCDD 2nd Regional Directorate also involved 30,000 m³ of excavation and fill.
Scope of work
- 01150 m long, 5.85 m high epoxy-coated corrugated steel tunnel
- 0280 m long, 8 m high stone wall and ballast retaining wall
- 03River crossing with 8 rows of 2.00×2.00 m precast concrete culverts
- 0430,000 m³ of earthworks
Site photos
Similar projects
3 photosRailway · Electrification
Track Superstructure and Electrification of the Sincan West Rail Link and Siding
2 photosRailway
High-Security Perimeter Systems at Osmaneli, Mekece and Pamukova Stations
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.