Track Superstructure and Electrification of the Sincan West Rail Link and Siding
For the TCDD General Directorate's Track Maintenance Department, the track superstructure and all electrification works of the Sincan West railway connection and depot area (siding) were delivered, including all design services. 13,160 m of track, 10 turnouts, 29,200 m³ of ballast and 10,000 m of cable ducts were built. Electrification, catenary and system integration for the same length of line were completed from design through procurement and installation. A technical building was also constructed as part of the project.
Scope of work
- 0113,160 m of track laying (including superstructure design)
- 0210 turnouts
- 0310,000 m of cable ducts
- 0429,200 m³ of ballast
- 052,250 m² of fencing
- 06Supply and installation of 280 concrete catenary poles
- 07Supply and installation of 30 steel catenary poles
- 081 technical building
- 09Electrification of 13,160 m of line: design, procurement and installation
Site photos
Similar projects
2 photosRailway
High-Security Perimeter Systems at Osmaneli, Mekece and Pamukova Stations
TCDD (Turkish State Railways)2021–2022
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
KM 370+5173 photosBridge · Railway
Highway Overpass at Km 370+517, Irmak–Zonguldak Railway
TCDD (Turkish State Railways)2020–2021