Track Renewal Between Bilecik and Karaköy (Yayla) Stations
For the TCDD 1st Regional Directorate, 6.5 km of existing railway between Bilecik and Karaköy (Yayla) stations was renewed, with our own crew operating TCDD's track maintenance equipment. The old track was dismantled with the client's track-laying machine and taken to the depot by wagon; at the panel assembly base we set up, 36 m panels were manufactured with UIC 60 rails and B70 sleepers and laid back in place. The scope also included the installation of four R300 turnouts and one R500 turnout linking the conventional line to the high-speed line.
Scope of work
- 01Dismantling of 6.5 km existing track with track-laying machinery
- 02Transport of dismantled material by wagons to the depot and separation
- 03Preparation of the subgrade
- 04Set-up of a work base for manufacturing 36 m panels with UIC 60 rails and B70 sleepers
- 05Loading the panels onto wagons and laying them with track-laying machinery
- 06Transport and laying of the first ballast layer with FB wagons
- 07Dismantling of 4 existing turnouts, installation of 4 R300 turnouts
- 08Installation of 1 R500 turnout (conventional line to high-speed line)
Site photos
Similar projects
3 photosRailway · Electrification
Track Superstructure and Electrification of the Sincan West Rail Link and Siding
TCDD (Turkish State Railways)2022–2023
2 photosRailway
High-Security Perimeter Systems at Osmaneli, Mekece and Pamukova Stations
TCDD (Turkish State Railways)2021–2022
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.