Gebze East Loop Connection to the Marmaray Depot
The civil works for the Gebze East loop, connecting the high-speed line to the main Marmaray depot in Gebze, were carried out on behalf of the TCDD 1st Regional Directorate. The work included 2,550 m of Ø120 cm bored piles, 7,700 m of soil nails and 2,000 m² of shotcrete. Stone walls, ballast retaining walls and the civil works for signalling were also part of our scope.
Scope of work
- 012,550 m of Ø120 cm bored piles
- 027,700 m of rock bolting
- 032,000 m² of shotcrete
- 04Stone wall and ballast retaining wall
- 05Civil works for signalling
Site photos
Similar projects
3 photosRailway · Electrification
Track Superstructure and Electrification of the Sincan West Rail Link and Siding
TCDD (Turkish State Railways)2022–2023
2 photosRailway
High-Security Perimeter Systems at Osmaneli, Mekece and Pamukova Stations
TCDD (Turkish State Railways)2021–2022
KM 167+2354 photosBridge · Railway · Road
Overpass Bridge at Km 159+680 and Underpass at Km 167+235, Arifiye–Pamukova
TCDD (Turkish State Railways)2020–2021
Planning a similar project?
Give us 15 minutes with your project team and we will walk you through our capacity and references.